My Build Cost eliminates all the mundane data
entry tasks that you have to go through via
conventional means.
Extensive in-built technical
data libraries.
Digital take- off for faster
estimations.
Excel integration to upload WBS templates, tender documents and Rate analysis libraries.
Along with transparency and accuracy, My Build Cost enables smart work and minimizes reworks and re-entry errors resulting in faster estimation.
Colour coded quantity tracings with highlighting feature for complete transparency.
Project wise cost libraries for items and resources with unique Rate analysis feature.
Overlay feature for easy tracking and quantity editing for drawing revisions.
Go paperless! No more paper plans or measurement sheets needed.
My Build Cost offers a variety of tools to facilitate easy collaboration between all parties involved with standard approach for cost estimation and control.
Role-based access to onboard multiple custodians for one project.
Smart comments, call out, cloud marking features for drawings and measurement tracings.
Set permissions to make sure that the right persons have the access to the right information.
Management people and owners are generally most interested in a dashboard overview of the project performance. Excel requires a lot of manual processing every time to get the desired report output.
MBC contains integrated report manager. Useful reports are at a click of a button. And since they are system generated, you can be assured that there are no calculation errors.
Automated Budget, Estimation and Cost variance reports.
Estimation break up report.
Customisable Material/ labour requirement reports.
Export summary/ detailed reports in PDF and Excel.
Powerful reports to handle material requisition, reconciliation, contracts and purchases.
Even though cost overruns may seem to be inherited in most projects, they can be reduced or eliminated by controlling and monitoring projects meticulously. MBC integrates your cost estimation and cost control process and provides you better judgment and insight to avoid cost overruns.
Identify the Red flags due to inflation and rise in material/labour prices.
Manage your procurement and material consumption well to avoid wastage.
Real time cost variance tracking to take corrective actions well in advance.